Akintoye, A and Skitmore, M R (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(03), 257-70.

  • Type: Journal Article
  • Keywords: accuracy; econometrics; forecasting; tender price index
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446199400000033
  • Abstract:

    This paper examines the relative performance of three different systems of forecasting movements in macro building prices. The three systems analysed are the Building Cost Information Service system, the Davis, Langdon & Everest system and Akintoye and Skitmore’s reduced-form simultaneous equation. A battery of accuracy measures are used to compare the forecasts published by the Building Cost Information Service and David, Langdon & Everest systems and simulated out-sample forecasts made by the Akintoye and Skitmore system. The results indicate that, during the 3 year period commencing with the first quarter of 1988, the Akintoye and Skitmore system gives the most accurate forecasts for a zero to three quarters forecast horizon and the Building Cost Information Service system gives the most accurate forecasts for a four to eight quarters forecast horizon.

Aouad, G F, Ford, S R, Kirkham, J A, Brandon, P S, Brown, F E, Child, T, Cooper, G S, Oxman, R E and Young, B A (1994) Knowledge elicitation using protocol analysis in a workshop environment. Construction Management and Economics, 12(03), 271-8.

Betts, M and Ofori, G (1994) Strategic planning for competitive advantage in construction: the institutions. Construction Management and Economics, 12(03), 203-17.

Jaselskis, E J and Suazo, G A R (1994) A survey of construction site safety in Honduras. Construction Management and Economics, 12(03), 245-55.

Ofori, G (1994) Formulating a long-term strategy for developing the construction industry of Singapore. Construction Management and Economics, 12(03), 219-31.

Ranasinghe, M (1994) Contingency allocation and management for building projects. Construction Management and Economics, 12(03), 233-43.

Walker, A and Kalinowski, M (1994) An anatomy of a Hong Kong project: organization, environment and leadership. Construction Management and Economics, 12(03), 191-202.